Work diary
floorglues have been sanded off and attached vinyls to floor in kitchen and bedroom. We have painted every wall in the apartment. Window frames were sanded and painted from brown to white. New cabinet came to the hallway and we structured it in whole. livingroom parquet has been sanded and lackered.
This week we have done kitchen almost ready, only floorboards are missing. We have screwed kitchen cabinets to the wall and glued background plate between the cabinets. table tops have been screwed and plinths are attached. Wallpapers are glued to livingroom and bedroom, we painted cabinet plinths. On the livingroom we glued floorboards to the wall.
We have to glue rest of the floorboards and clean up the whole apartment and then it will be ready.
Now we had to sand sauna and treat panels with sauna protect. That took four days and lots of self control. Door frames had to be sanded and painted and special boards connected to new cabinets. In the bathroom we glued displaced tiles back to wall and then we have to seam those.
Ei kommentteja:
Lähetä kommentti